ISSN 2394-5125
 

Research Article 


IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS

FARZAD FADAIE, MEHDI AZHDARY MOGHADDAM, MOHAMMAD REZA SHAHRAKI.

Abstract
One of the factors that contribute to large cost-effective projects is identifying and ranking the risks that affect them. Due to their time-consuming
and costly nature, as well as complex spatial conditions, dam construction projects carry a higher risk compared to other construction projects. This
study identifies and ranks the risks associated with dam construction projects in terms of their importance using the jackknife resampling method
along with interval analysis. Project risk assessment requires identifying project-related risks and subsequently ranking them and measuring their
impact on the project using the jackknife method and interval analysis. The results showed that the risks related to dam construction projects could
be easily ranked by assessing the risks involved in dam construction projects using the jackknife method.

Key words: Dam Construction, Assessment, Risk, Interval Analysis, Jackknife


 
ARTICLE TOOLS
Abstract
PDF Fulltext
How to cite this articleHow to cite this article
Citation Tools
Related Records
 Articles by FARZAD FADAIE
Articles by MEHDI AZHDARY MOGHADDAM
Articles by MOHAMMAD REZA SHAHRAKI
on Google
on Google Scholar


How to Cite this Article
Pubmed Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI. IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS. JCR. 2020; 7(17): 3411-3418. doi:10.31838/jcr.07.17.422


Web Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI. IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS. http://www.jcreview.com/?mno=36421 [Access: August 17, 2021]. doi:10.31838/jcr.07.17.422


AMA (American Medical Association) Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI. IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS. JCR. 2020; 7(17): 3411-3418. doi:10.31838/jcr.07.17.422



Vancouver/ICMJE Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI. IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS. JCR. (2020), [cited August 17, 2021]; 7(17): 3411-3418. doi:10.31838/jcr.07.17.422



Harvard Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI (2020) IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS. JCR, 7 (17), 3411-3418. doi:10.31838/jcr.07.17.422



Turabian Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI. 2020. IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS. Journal of Critical Reviews, 7 (17), 3411-3418. doi:10.31838/jcr.07.17.422



Chicago Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI. "IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS." Journal of Critical Reviews 7 (2020), 3411-3418. doi:10.31838/jcr.07.17.422



MLA (The Modern Language Association) Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI. "IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS." Journal of Critical Reviews 7.17 (2020), 3411-3418. Print. doi:10.31838/jcr.07.17.422



APA (American Psychological Association) Style

FARZAD FADAIE , MEHDI AZHDARY MOGHADDAM , MOHAMMAD REZA SHAHRAKI (2020) IDENTIFICATION AND RANKING OF DAM CONSTRUCTION PROJECT RISKS USING JACKKNIFE RESAMPLING METHOD ALONG WITH INTERVAL ANALYSIS. Journal of Critical Reviews, 7 (17), 3411-3418. doi:10.31838/jcr.07.17.422